This page location is:
BPA.gov - Bonneville Power Administration
Environment, Fish & Wildlife
Environmental Analysis
Categorical Exclusions
Pages
2012
Sign In
About
|
Careers
|
Contact
|
Investors
|
bpa.gov
Search
Environmental Stewardship
Our Values
Environmental Management System
Fish & Wildlife
Columbia Basin Fish Accords
Information for Contractors
Land Acquisitions
Resident Fish
Salmon and Steelhead
Spill Operation Agreement
Wildlife
Environmental Analysis
Currently selected
Types of NEPA Documents
Project Reviews
Categorical Exclusions
Endangered Species Act Process
Laws & Requirements
Cultural Resources
Transmission
Fish and Wildlife
FCRPS Cultural Resource Program
Pollution Prevention
Types of NEPA Documents
Project Reviews
Categorical Exclusions
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
Currently selected
2011
2010
2009
Endangered Species Act Process
Laws & Requirements
Categorical Exclusions 2012
December
Bertelsen Substation Metering Panel Segment Addition
(14Kb pdf) (12/31/12)
Tualatin Valley Water District Waterline Land Use Review Request
(37Kb pdf) (12/31/12)
Sale of Lakeside Radio Station
(27Kb pdf) (12/27/12)
Continuation of Yakama Nation Sturgeon Management Project
(37Kb pdf) (12/27/12)
Finely Creek and North Valley Creek Property Funding Project
(
4.1MB
pdf) (12/27/12)
Williams Northwest Pipeline Land Use Review Request
(34Kb pdf) (12/27/12)
Columbia Rural Electric Association Walla Walla Hydroelectric Project
(31Kb pdf) (12/21/12)
Lower Granite-Hatwai Access Road Improvements
(31Kb pdf) (12/19/12)
Pasco Land Acquisition
(26Kb pdf) (12/17/12)
Lane Substation Transformer Phase Separation Project
(23Kb pdf) (12/06/12)
Keeler Substation-Control House Expansion
(
1.2MB
pdf) (12/04/12)
Alcoa Power Sales Contract
(33Kb pdf) (12/04/12)
Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl and Wren Substations Drainage Upgrades FY13
(23Kb pdf) (12/03/12)
November
Drummond-Macks Inn, Macks Inn-Madison, Swan Valley-Teton Wood Pole Replacements
(28Kb pdf) (11/29/12)
Spring Creek-Wine Country Transmission Tower Relocation
(22Kb pdf) (11/29/12)
Snohomish Substation Control House Expansion and Seismic Retrofit
(39Kb pdf) (11/08/12)
Tualatin River Pipeline Crossing Site - Monitoring Well Redevelopment
(35Kb pdf) (11/08/12)
Tide Creek Property Funding
(31Kb pdf) (11/08/12)
Tucannon River Substation Expansion
(23Kb pdf) (11/01/12)
October
Malin Substation Relay Equipment Replacements
(21Kb pdf) (10/19/2012)
Franklin-Badger Canyon and Grandview-Red Mountains Disconnect Switches
(27Kb pdf) (10/18/12)
Aquatic Invasive Mussels Monitoring
(27Kb pdf) (10/15/12)
FY 2013 Technology Innovation Portfolio
(31Kb pdf) (10/15/12)
Amendment Number 2 to the Port Townsend Paper Corporation Power Sales Agreement
(30Kb pdf) (10/01/12)
Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps
(40Kb pdf) (10/01/12)
September
Hatwai-Dworshak #1 Spacer Replacement Project
(28Kb pdf) (09/24/12)
Ross Transformer Oil Terminal Upgrade
(28Kb pdf) (09/24/12)
Kalispell-Kerr #1 Access Road Improvements
(32Kb pdf) (09/20/12)
Ross Maintenance Headquarters Project
(37Kb pdf) (09/19/12)
Respond to the Town of Eatonville's Land Use Review Request (LURR) Agreement
(26Kb pdf) (09/19/12)
Short-term Additional Amendments to the Alcoa Power Sales Agreement
(35Kb pdf) (09/14/12)
Port Angeles Substation Equipment Additions
(30Kb pdf) (09/14/12)
Bonneville-Hood River #1 Danger Poles and Access Roads
(67Kb pdf) (09/14/12)
Rice Flats Electrode Site Maintenance and Inspection Project
(111Kb pdf) (09/12/12)
Chahalpam Property Funding
(37Kb pdf) (09/12/12)
Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for Purchase of Skidoo Creek, Post Creek, and Bird's Eye View Properties
(
1.9MB
pdf) (09/05/12)
Provision of Funds to the Shoshone-Paiute Tribes of the Duck Valley Reservation (Shoshone-Paiute Tribes) to Purchase Five Parcels of land in Owyhee County, Idaho
(37Kb pdf) (09/04/12)
Provision of Funds to the Washington Department of Fish and Wildlife (WDFW) to Purchase Two Parcels of Land from the Trust for Public Land in Okanogan County, Washington
(37Kb pdf) (09/04/12)
August
Silver Butte Fiber Burial Project
(46Kb pdf) (08/28/12)
Bingen Substation Sectionalizing Switches Disposition
(35Kb pdf) (08/27/12)
Railroad Island Property Funding
(35Kb pdf) (08/22/12)
Midstate Electric Cooperative, Inc, Integration Request, Line and Load Interconnection Request L0296
(Update to Previous Categorical Exclusion Issued on September 30, 2009)
(25Kb pdf) (08/21/12)
Driscoll-Naselle Access Road Maintenance
(62Kb pdf) (08/21/12)
Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project
(81Kb pdf) (08/13/12)
Celilo Converter Station Converter Wall Replacement
(59Kb pdf) (08/08/12)
Mountain Avenue Tap Line Sectionalizing Switch Disposition
(60Kb pdf) (08/08/12)
SnoKing Substation Expansion
(58Kb pdf) (08/08/12)
Indian Creek Property Funding
(27Kb pdf) (08/14/12)
Rattlesnake Butte Property Funding
(30Kb pdf) (08/13/12)
Raver Substation-Control House Expansion and Seismic Retrofit
(31Kb pdf) (08/13/12)
AT&T Fiber Addition North Bonneville-Ross No. 2
(55Kb pdf) (08/09/12)
D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek
(24Kb pdf) (08/06/12)
North Bonneville-Midway #1 Tower 75/4 Replacement
(29Kb pdf) (08/01/12)
Wautoma-Ostrander Surface Impairment Removal
(27Kb pdf) (08/01/12)
July
Department of Natural Resources Access Road Improvements
(28Kb pdf) (07/30/12)
Pilot Butte-La Pine #1 Wood Pole Replacements
(34Kb pdf) (07/30/12)
Four AT&T Wireless Communication Site Upgrades
(37Kb pdf) (07/27/12)
Short-term Additional Amendments to the Alcoa Power Sales Agreement
(31Kb pdf) (07/23/12)
Columbia and Willamette River Crossing Liquefaction Hazard Assessment
(31Kb pdf) (07/23/12)
Hills Creek-Lookout Point #1 Wood Pole Replacements
(33Kb pdf) (07/19/12)
Hot Springs Substation Gravity Drain Install
(32Kb pdf) (07/19/12)
Olympia-Grand Coulee Tower 85/5 Relocation
(41Kb pdf) (07/19/12)
Schultz-Raver No.1 Right-Of-Way (ROW) Marking Project
(77Kb pdf) (07/19/12)
Ostrander-Troutdale #1 Access Road Improvements at 16/1
(28Kb pdf) (07/18/12)
South Tacoma-Frederickson Fiber Project
(Update to Previous Categorical Exclusion Issued on June 10, 2011)
(31Kb pdf) (07/13/12)
Shaniko Radio Station Replacement Project
(24Kb pdf) (07/11/12)
Metaline Radio Station Upgrade Project
(52Kb pdf) (07/11/12)
Big Eddy-Troutdale #1 Line Upgrade
(80Kb pdf) (07/11/12)
Mountain Avenue Substation and Tap Line Disposition
(26Kb pdf) (07/11/12)
Bandon-Rogue Rebuild Culvert and Access Roads
(29Kb pdf) (07/06/12)
Installation of Equipment at Wahkiakum Public Utility District's (PUD) Cathlamet Substation
(
1.6MB
pdf) (07/02/12)
June
2012 Q3 & Q4 Spacer and Insulator Replacements for Multiple Lines
(102Kb pdf) (06/28/12)
Lancaster Line and Load Project - LO311
(213Kb pdf) (06/28/12)
Mason Substation Metering Replacement Project
(32Kb pdf) (06/25/12)
Amendment Number 2 to the Alcoa Power Sales Agreement
(69Kb pdf) (06/22/12)
Chehalis-Centralia #2 Wood Pole Replacements
(32Kb pdf) (06/20/12)
Sacajawea-Sun Harbor, Cascade Steel Tap Acquisition and Disposition
(70Kb pdf) (06/20/12)
Munro Control Center Expansion
(31Kb pdf) (06/19/12)
Power Circuit Breaker Replacements - Multiple Locations
(73Kb pdf) (06/12/12)
Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line
(25Kb pdf) (06/12/12)
Poorman Ponds Property Funding
(27Kb pdf) (06/12/12)
Old Highway Bridge Property Funding
(27Kb pdf) (06/12/12)
Natapoc Property Funding
(27Kb pdf) (06/12/12)
Spring Basin Wilderness Land Exchange
(36Kb pdf) (06/05/12)
Forest Grove-McMinnville #1 Wood Pole Replacements
(30Kb pdf) (06/05/12)
May
Oregon City-Chemawa #2 Wood Pole Replacements
(33Kb pdf) (05/31/12)
Grand Coulee-Bell #3 Reconductoring
(29Kb pdf) (05/31/12)
Santiam Substation Secondary Containment Upgrades
(28Kb pdf) (05/30/12)
Tunk Mountain Radio Station Upgrade
(48Kb pdf) (05/30/12)
Bettas Road-Columbia #1 Thermal Line Upgrade
(27Kb pdf) (05/25/12)
Chehalis-Olympia Chehalis-Mayfield Wood Poles
(33Kb pdf) (05/25/12)
Shelton-Fairmount #1 Wood Poles
(32Kb pdf) (05/24/12)
Amendment Number 1 to the Alcoa Power Sales Agreement
(31Kb pdf) (05/23/12)
Amendment to Firm Power Sales Agreement with Port Townsend Paper Corporation
(30Kb pdf) (05/23/12)
Lookout Point-Alvey Wood Pole Replacements
(35Kb pdf) (05/21/12)
Chemawa District Wood Pole Replacements 2012
(35Kb pdf) (05/21/12)
Alvey-Fairview/Alvey-Martin Creek/Martin Creek-Drain Wood Pole Replacements 2012
(34Kb pdf) (05/21/12)
Alvey District Wood Pole Replacements 2012
(37Kb pdf) (05/21/12)
Bonneville Power Administration (BPA) Tacoma Power Chehalis-Covington 230-kilovolt (kV) Line - Convert Microwave Signals from Analog to Digital
(27Kb pdf) (05/21/12)
Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation
(33Kb pdf) (05/17/12)
Revolution Energy Services (RES) Agriculture (Ag) - Forest Glen Oaks LLC Biomass Project
(32Kb pdf) (05/16/12)
Naselle-Tarlett #1, Holcomb-Naselle #1 & Raymond-Willapa River #1 Wood Poles
(32Kb pdf) (05/16/12)
BPA Acquisition of OTEC Disconnect Switch at the BPA LaGrande Substation
(24Kb pdf) (05/16/12)
City of Longview Pump Stations and Force Main Project
(35Kb pdf) (05/15/12)
Reintroduction of Westslope Cutthroat Trout in the Pend Orielle Basin
(37Kb pdf) (05/07/12)
Kalispell District 2012 Wood Pole Replacements
(63Kb pdf) (05/03/12)
Provision of Funds to the Columbia Land Trust for the Purchase of Five Parcels of Land located near the Lower Elochoman River
(33Kb pdf) (05/02/12)
Whitefish In-line Hydroelectric Project
(32Kb pdf) (05/01/12)
Maupin-Tygh Valley #1 Wood Pole Replacement
(28Kb pdf) (05/01/12)
April
Driscoll-Naselle #1 Wood Pole Replacements
(32Kb pdf) (04/30/12)
Provision of Funds to Idaho Department of Fish and Game (IDFG) for Purchase of Southern Idaho Wildlife Mitigation Properties
(
2.2MB
pdf) (04/25/12)
AMENDED Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property
(30Kb pdf) (04/24/12)
Murray-Custer #1 Wood Pole Replacements
(66Kb pdf) (04/23/12)
South Tacoma-Cowlitz #1 Wood Pole Replacements
(27Kb pdf) (04/23/12)
North Bend District 2012 Wood Pole Replacements
(33Kb pdf) (04/23/12)
The Dalles-Discovery Wood Pole Replacements
(63Kb pdf) (04/23/12)
Prosser Hatchery Backup Generator Replacement
(250Kb pdf) (04/16/12)
Redmond-Pilot Butte Wood Pole Replacements
(60Kb pdf) (04/13/12)
March
Portland General Electric (PGE) 13-kilovolt (kV) Overhead Electrical Line Land Use Review Request (LURR)
(41Kb pdf) (03/28/12)
Captain Jack-Olinda RAS LLL/LT Replacement Project
(32Kb pdf) (03/26/12)
Oversupply Management Protocol
(29Kb pdf) (03/23/12)
Non-Treaty Storage Agreement
(34Kb pdf) (03/22/12)
AMENDED: Acquisition of a Portion of Cowlitz County Public Utility District's (CCPUD) 115-kV Transmission Line from BPA's Longview Substation to CCPUD's Washington Way Substation
(33Kb pdf) (03/22/12)
La Pine-Chiloquin #1 Wood Pole Replacements
(32Kb pdf) (03/21/12)
Snohomish High School Field Improvements
(32Kb pdf) (03/20/12)
Integration of the Echo Point Community
Wind Generation Project (31Kb pdf) (03/20/12)
Spokane District 2012 Wood Pole Replacements
(38Kb pdf) (03/15/12)
Wenatchee District 2012 Wood Pole Replacements
(32Kb pdf) (03/14/12)
Pasco District 2012 Wood Pole Replacements
(35Kb pdf) (03/14/12)
Bell-Addy #1 Disconnect Switch Replacements
(33Kb pdf) (03/12/12)
Big Eddy-Chenoweth #1 & #2 Wood Pole Replacements
(29Kb pdf) (03/09/12)
Pearl-Marion Access Road Easement Acquisition
(26Kb pdf) (03/06/12)
2012 Q1 & Q2 Spacer and Insulator Replacements for Multiple Lines
(36Kb pdf) (03/06/12)
February
Pearl-Marion #1 Tower 6/2 Replacement
(36Kb pdf) (02/23/12)
Old School House Property Funding
(32Kb pdf) (02/15/12)
Clark County Harding Farms LURR
(35Kb pdf) (02/14/12)
Grant County PUD - Columbia Substation Interconnection Project
(37Kb pdf) (02/14/12)
Pearl Substation 500-kilovolt (kV) #6 Bay Addition
(27Kb pdf) (02/13/12)
Drummond-Macks Inn, Macks Inn-Madison & Targhee Tap Wood Pole Replacements
(33Kb pdf) (02/10/12)
2012 Stormwater Upgrades at Sifton, Cascade Locks, Sandpoint, Kitsap, Gardiner, Aberdeen, Martin Creek & Murray Substations
(28Kb pdf) (02/10/12)
Hatwai Substation Breaker Replacement
(26Kb pdf) (02/09/12)
Redmond Substation Septic System Upgrades
(28Kb pdf) (02/08/12)
Big Eddy Substation Septic System Upgrade
(26Kb pdf) (02/07/12)
Rocky Reach-Maple Valley #1 Temporary Bridge Install
(27Kb pdf) (02/07/12)
Grant Consumer Power, Inc.'s Request for Use of Right-of-Way (ROW) at Harrisburg Substation
(REV 2-20110432)
(33Kb pdf) (02/06/12)
Integration of Stoltze Land & Lumber Biomass Generation
(32Kb pdf) (02/02/12)
Minidoka Power House-Unity #1, Unity-Heyburn #1 Wood Pole Replacements
(33Kb pdf) (02/02/12)
January
Multi-Species Acclimation Project - Heath Pond
(29Kb pdf) 1/20/12
McNary-Ross Surface Impairment Upgrade
(22Kb pdf) (1/13/12)
Centennial Marsh Wildlife Management Area Office Construction
(28Kb pdf) (1/12/12)
Three Sisters Irrigation District Hydro Generation Integration
(28Kb pdf) (1/12/12)
Zirkle Fruit Water Pipeline Easement at Columbia Substation
(28Kb pdf) (1/11/12)
Farm Power Misty Meadows Generating Facility Integration
(27Kb pdf) (1/10/12)
Provision of Funds to the Colville Confederated Tribes for the Purchase of Two Parcels of Land along the Okanogan River Towers
(32Kb pdf) (01/01/12)
Policies
Accessibility
Privacy Policy
Get Involved
Contact
Investors
Public Meetings
Submit a Comment
Functions
Energy Efficiency
Environment, Fish
&
Wildlife
Power
Transmission
Stay Connected
Facebook
Flickr
Instagram
LinkedIn
YouTube
Twitter
Related Sites
Energy.gov
WhiteHouse.gov