This page location is:
BPA.gov - Bonneville Power Administration
Environment, Fish & Wildlife
Environmental Analysis
Categorical Exclusions
Pages
2014
Sign In
About
|
Careers
|
Contact
|
Investors
|
bpa.gov
Search
Environmental Stewardship
Our Values
Environmental Management System
Fish & Wildlife
Columbia Basin Fish Accords
Information for Contractors
Land Acquisitions
Resident Fish
Salmon and Steelhead
Spill Operation Agreement
Wildlife
Environmental Analysis
Currently selected
Types of NEPA Documents
Project Reviews
Categorical Exclusions
Endangered Species Act Process
Laws & Requirements
Cultural Resources
Transmission
Fish and Wildlife
FCRPS Cultural Resource Program
Pollution Prevention
Types of NEPA Documents
Project Reviews
Categorical Exclusions
2021
2020
2019
2018
2017
2016
2015
2014
Currently selected
2013
2012
2011
2010
2009
Endangered Species Act Process
Laws & Requirements
​Categorical Exclusions 2014
December
Wahkiakum Disconnect Switch Project
(129Kb pdf) (12/30/14)
Alderwood Substation Disposition
(95Kb pdf) (12/19/14)
Ross Substation Property - Ellen Davis Trail Reroute
(94Kb pdf) (12/18/14)
LURR 20140554 Reston Substation Fiber Optic Connection
(138Kb pdf) (12/18/14)
Sacheen Substation Protective Relay Replacements
(133Kb pdf) (12/15/14)
Idaho Falls District 2015 Wood Pole Replacements
(145Kb pdf) (12/02/14)
November
Olympia Black Lake Wireless Communication Site
(97Kb pdf) (11/25/14)
Cornelius Pass Road Widening within Keeler-Allston Corridor Project
(152Kb pdf) (11/20/14)
Keeler Substation Radio Communication Upgrades
(134Kb pdf) (11/19/14)
AT&T Fiber Installation at Teton Substation
(138Kb pdf) (11/19/14)
Martin Creek Control House Replacement
(138Kb pdf) (11/19/14)
Otter Island 1 and 2 Property Acquisition Funding
(139Kb pdf) (11/14/14)
Ohop Substation Telephone Line Relocate
(130Kb pdf) (11/06/14)
Franklin Walla-Walla Line Tap
(115kb pdf) (11/06/14)
Chief Joseph-Monroe Access Road Test Section
(138Kb) (11/05/14)
Reston-Fairview #2 Line Impairments
(136Kb) (11/05/14)
October
Ross Dog Water Fountain
(370Kb pdf) (10/29/14)
Haystack Butte Radio Site Land Acquisition
(134Kb pdf) (10/27/14)
McNary Substation Transformer Addition
(153Kb pdf) (10/24/14)
Grizzly Captain Jack Transmission Line Access Road Acquisition
(137Kb pdf) (10/23/14)
Amendment Number 5 to the Port Townsend Power Sales Agreement
(116Kb pdf) (10/23/14)
15-Minute Transmission Scheduling
(138Kb pdf) (10/21/14)
Idaho Department of Fish and Game (IDFG) Eagle Hatchery Chilled Water Supply Thermal Buffering System Improvement Project (B1.5 Improvements to cooling water systems within existing building, structure)
(128Kb pdf) (10/15/14)
North Bonneville Substation 230-kV Line Retermination
(153Kb pdf) (10/14/14)
Bell Substation Equipment Replacements
(140Kb) (10/08/14)
Big Eddy-Redmond #1 Wood Pole Replacements
(88Kb) (10/07/14)
Canby Tap to Malin-Hilltop #1 Wood Pole Replacements
(56Kb) (10/03/14)
Davis Creek Tap Wood Pole Replacements
(55Kb) (10/03/14)
Malin-Hilltop Wood Pole Replacements
(77Kb) (10/03/14)
NERC-CIP Security Upgrades
(144Kb pdf) (10/03/14)
Acquisition and Release of Multiple Access Road and Right-of-Way Easements
(171Kb pdf) (10/01/14)
Portland General Electric (PGE) Dark Fiber Interconnection
(29Kb pdf) (10/01/14)
September
Sacajawea Substation Expansion and Upgrade
(42Kb pdf) (09/30/14)
Pilot Butte-La Pine #1 Wood Pole Replacements
(87Kb) (09/30/14)
Brasada-Harney #1 Wood Pole Replacements
(56Kb) (09/26/14)
Puget Sound Area Northern Intertie - Covington and Raver substation upgrades (Amendment No. 2; update to previous categorical exclusion issued August 7, 2014 and September 3, 2014)
(39Kb pdf) (09/26/14)
Acton Substation Equipment Sale
(59Kb pdf) (09/24/14)
LURR 20140504 Ross Substation Comcast Fiber Installation
(63Kb pdf) (09/24/14)
LURR 20140313 City of Vancouver Sewer Lateral
(62Kb pdf) (09/24/14)
St Johns-Keeler Minor Access Road Improvement
(79kb pdf) (09/19/14)
Columbia Falls-Kalispell Transmission Line, road approach installation and structure relocation
(52Kb pdf) (09/17/14)
Chemawa-Salem #1 & #2 Access Road Maintenance
(25Kb) (09/11/14)
Redmond-Pilot Butte #1 Wood Pole Replacements
(25Kb) (09/11/14)
Minidoka Power House-Unity #1 Access Road Maintenance
(32Kb) (09/11/14)
Sale of Pennwalt Tap to PGE Harborton-Station E Line
(34Kb pdf) (09/10/14)
Rogue-Gold Beach Access Road Improvement
(29Kb) (09/08/14)
Bell Maintenance Headquarters Access Road Maintenance
(23Kb) (09/08/14)
La Pine-Chiloquin Wood Pole Replacements
(31Kb) (09/05/14)
Midway/Tri-Cities Bundle Equipment Upgrades
(58kb pdf) (09/04/14)
Aggregated Demand Response Pilot Project
(39Kb pdf) (09/03/14)
Puget Sound Area Northern Intertie-Covington and Raver substation upgrades
(66kb pdf) (09/03/14)
Equipment and Property Transfers in Idaho (update to previous categorical exclusion, "Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington," issued December 26, 2013)
(61kb pdf) (09/03/14)
LURR 20140456 - Salmon Creek Avenue Pathway Project
(64kb pdf) (09/03/14)
Wautoma-Ostrander #1 Line Upgrade
(31Kb pdf) (09/02/14)
August
PGE Overhead Fiber Land Use Review Requests 20130557, 20130551, and 20130476
(62kb pdf) (08/28/14)
Fiscal Year 2015 Technology Innovation Portfolio
(64Kb pdf) (08/28/14)
Aquatic Invasive Mussels Research
(60Kb pdf) (08/27/14)
Woodward Meadows Property Acquisition Funding
(
3.1Mb
pdf) (08/25/14)
LURR 20140521 - David King - Sewer Line Installation
(57kb pdf) (08/25/14)
Santiam-Toledo Structure 39/7 Replacement
(27Kb) (08/25/14)
Rocky Reach-Maple Valley #1 Line Bridge Installation
(24Kb) (08/22/14)
Conductor Impairment Site Structure Raises or Modifications - Multiple Locations in OR and WA
(99Kb pdf) (08/22/14)
Chehalis-Covington #1 Structure 5/4 Footing Replacement
(21Kb pdf) (08/18/14)
Lexington-Longview #1 Access Road Maintenance
(24Kb pdf) (08/14/14)
Mossy Rock-Chehalis #1 Access Road Maintenance
(23Kb pdf) (08/14/14)
Snohomish-Beverly Park #3 & #4 Line Structure Replacements
(24Kb pdf) (08/14/14)
Chehalis-Covington #1 Access Roads
(23Kb) (08/14/14)
Puget Sound Area Northern Intertie (PSANI) - Covington and Raver Substation Upgrades
(70KB pdf) (08/13/14)
Wenatchee District 2014 Transmission Line Maintenance - Multiple Lines
(34Kb pdf) (08/11/14)
Spokane District 2014 Transmission Line Maintenance - Multiple Lines
(37Kb pdf) (08/11/14)
Kalispell District 2014 Transmission Line Maintenance - Multiple Lines
(32Kb pdf) (08/11/14)
Bonneville Power House-Alcoa #2 Tower Relocation
(25Kb pdf) (08/06/14)
Chahalpam Phase II property funding
(
1.05Mb
pdf) (08/06/2014)
Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon
(64Kb pdf) (08/08/14)
LURR 20140464 - Spencer May - Fence Construction
(58Kb pdf) (08/07/14)
Xeriscaping at Five Facilities (
update to previous categorical exclusion issued December 10, 2013
)
(64Kb pdf) (08/06/14)
Holcomb-Naselle #1 Access Road Improvements
(23Kb pdf) 08/04/14)
July
Red Hills Property Acquisition Funding
(65Kb pdf) (07/30/14)
Acquisition of Access Road Easements
(63Kb pdf) (07/29/14)
North Bend Communication Site Engine Generator Replacement
(29Kb pdf) (07/28/14)
Approval of a Land Use Review Request (LURR) for Fencing in Right-of-Way in Washington County
(81Kb pdf) (07/28/14)
Chief Joseph and Custer Substations Security Fence Replacement
(64Kb pdf) (07/23/14)
Approval of a Land Use Review Request (LURR) for Fencing in Right-of-Way in Klickitat County
(67Kb pdf) (07/23/14)
McNary-Ross Tower 137/4 Replacement
(22Kb) (07/17/14)
Equipment Installations at Multiple Substations and Radio Facilities
(75Kb pdf) (07/14/14)
Thurston Hills Property Phase 2 Acquisition Funding
(879kb pdf) (07/08/2014)
Sno-King Tap Miles 10-11 Access Road Improvements
(23Kb) (07/07/14)
Monroe-Custer Miles 38 and 55-58 Access Road Improvements
(24Kb) (07/07/14)
Hillside Road and Squeque Properties Acquisition Funding
(3.7Mb pdf) (07/03/14)
June
Palisades-Swan Valley Transmission Line Rebuild
(39Kb) (06/30/14)
Harney Substation Digital Communications Upgrade
(64Kb pdf) (06/30/14)
Turtle Flats Property Acquisition Funding
(64kb pdf) (06/25/14)
Coyote Creek Property Acquisition Funding
(2.74 Mb pdf) (06/25/14)
PAC-CAISO Energy Imbalance Market Agreement
(60KB pdf) (06/24/14)
Tacoma Communication Site Engine Generator Replacement
(66KB pdf) (06/19/14)
Alcoa Digital Upgrade in Oregon and Washington
(66KB pdf) (06/19/14)
Deer Park Substation Connection Modifications
(63KB pdf) (06/17/14)
Longview-Chehalis #3 Transmission Structure Footing Repair
(22Kb) (06/12/14)
Telecommunications Facilities Rehabilitation (Multiple Sites)
(24Kb) (06/11/14)
Mica Peak Radio Station Upgrade
(update to previous categorical exclusion issued March 3, 2014)
(69KB pdf) (06/09/14)
Shed Acquisition at Kalispell Substation
(69KB pdf) (06/09/14)
Swan Valley-Teton Overhead Fiber Line Install
(83Kb) (06/02/14)
Cowlitz Tap Rebuild and Access Road Maintenance
(25Kb) (06/02/14)
Hood River-Coop Service #1 Access Road Maintenance
(43Kb) (06/02/14)
May
Longview-Cowlitz Fiber Optic Cable Upgrade
(update to previous Categorical Exclusion
issued January 6, 2014)
(63KB pdf) (05/28/2014)
Asarco and Troy Substations Grounding Mat Installations
(23Kb) (05/27/14)
Swan Lake Point Radio Station Project
(51Kb pdf) (05/22/14)
North Bonneville-Midway #1 Insulator Replacements
(38Kb) (05/21/14)
Murray, Snohomish, and Sno-King Substations Equipment Acquisition
(62Kb pdf) (05/21/14)
Chehalis-Olympia #1 Access Road Maintenance
(23Kb) (05/14/14)
Naselle-Tarlett #1 Access Road Maintenance
(24Kb) (05/14/14)
Custer-Ingledow Access Road Maintenance
(22Kb) (05/14/14)
Bell-Boundary Fiber Project (
update to previous Categorical Exclusion issued on
June 11, 2013
)
(30KB pdf) (05/12/14)
North Bend District Wood Pole Replacements 2014
(32Kb) (05/09/14)
Pasco District Wood Pole Replacements (Multiple Lines) 2014
(89Kb) (05/09/14)
Hawkins-Alvey Line Impairment
(27Kb) (05/08/14)
FY14 Communication Site Engine Generator Replacements
(37Kb pdf) (05/05/14)
Slatt Substation Meter and Communication Equipment Installation
(29Kb pdf) (05/05/14)
Santiam Substation 230-kV Shunt Reactor Replacement
(33Kb pdf) (05/05/14)
Alfalfa Substation Control House Replacement
(30Kb pdf) (05/02/14)
April
Structure and Debris Removal from Howes and Bird's Eye View Properties
(24Kb pdf) (04/30/14)
Celilo Converter Station Upgrades (
update to previous categorical exclusions issued on July 25, 2013
and March 11, 2014
)
(36Kb pdf) (04/30/14)
Big Eddy-Troutdale Insulator Replacements
(24Kb) (04/29/14)
Alvey District 2014 Wood Pole Replacements
(35Kb pdf) (04/28/14)
Chemawa District 2014 Wood Pole Replacements
(31Kb pdf) (04/28/14)
John Day Powerhouse-John Day #1-#4 Conductor Replacements
(22Kb pdf) (04/25/14)
Raver-Covington Conductor Replacement
(22Kb pdf) (04/24/14)
Meter Installation at Fossil Lake Solar Project
(30Kb pdf) (04/24/14)
Hatwai Substation Bay 4 Equipment Acquisition
(29Kb pdf) (04/22/14)
Burial of Overhead Fiber Optic Cable at Grand Coulee Radio Station
(30Kb pdf) (04/21/14)
Cowlitz Falls Fish Facility and Fish Transfer Facility Property Transfers
(26Kb pdf) (04/21/14)
Tacoma-Raver Access Road Easement Exchange
(30Kb pdf) (04/14/14)
Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line
(24Kb pdf) (04/11/14)
Hat Rock Tap Switching Station Equipment Transfer
(29Kb pdf) (04/10/14)
Marion-Alvey Marion-Lane Insulator Replacements
(24Kb pdf) (04/07/14)
Chehalis-Mayfield #1 Structure Replacements
(24Kb pdf) (04/03/14)
B3S4-White Bluffs #1 & Benton-B3S4 #1 Line Reroute
(30Kb pdf) (04/02/14)
Cowlitz Falls Fish Facility Access Agreement Extension
(13Kb pdf) (04/02/14)
Port Townsend Paper Corporation Power Sales Agreement Amendment
(34Kb pdf) (04/01/14)
March
Warm Springs Hydroelectric Small Generator Integration
(36Kb pdf) (03/18/14)
Wautoma Substation Telephone Line Removal
(27Kb pdf) (03/17/14)
Coyote Oaks Property Acquisition Funding
(
1.26MB
pdf) (3/12/14)
Celilo Converter Station Upgrades
(update to previous categorical exclusion issued on July 25, 2013)
(
1.43MB
pdf) (03/11/14)
The Dalles District 2014 Wood Pole Replacements (Multiple Lines)
(30Kb pdf) (03/11/14)
Noble Oaks Property Acquisition Funding
(
1.43MB
pdf) (03/07/14)
Mica Peak Radio Station Upgrade
(24Kb pdf) (03/03/14)
February
Levey Substation Control House Replacement
(24Kb pdf) (02/27/14)
Malin Substation Storm Drain & Switchyard Rock Improvements
(29Kb pdf) (02/06/14)
Bell-Boundary #3 Bank Stabilization
(22Kb pdf) (02/12/14)
Munro Scheduling Center Back-Up Generator Install
(23Kb pdf) (02/12/14)
January
Targhee Tap & Targhee-Drummond Wood Pole Replacements
(28Kb pdf) (01/29/14)
McNary Substation Equipment Acquisition
(32Kb pdf) (01/29/14)
Fiber Installation at Snohomish, SnoKing and Murray Substations
(45Kb pdf) (01/27/14)
Ellensburg-Moxee #1 Geotechnical Exploration
(31Kb pdf) (01/22/14)
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line
(34Kb pdf) (01/22/14)
Franklin to Hatwai Fiber Project
(
2.3MB
pdf) (01/17/14)
Lightspeed Network's Fiber Installation near Pilot Butte Substation
(33Kb pdf) (01/15/14)
Ross Communication Tower Fiber Installation
(24Kb pdf) (01/15/14)
Longview-Cowlitz Fiber Optic Cable Upgrade
(273Kb pdf) (01/06/14)
Policies
Accessibility
Privacy Policy
Get Involved
Contact
Investors
Public Meetings
Submit a Comment
Functions
Energy Efficiency
Environment, Fish
&
Wildlife
Power
Transmission
Stay Connected
Facebook
Flickr
Instagram
LinkedIn
YouTube
Twitter
Related Sites
Energy.gov
WhiteHouse.gov