This page location is:
BPA.gov - Bonneville Power Administration
Environment, Fish & Wildlife
Environmental Analysis
Categorical Exclusions
Pages
2021
Sign In
About
|
Careers
|
Contact
|
Investors
|
bpa.gov
Search
Environmental Stewardship
Our Values
Environmental Management System
Fish & Wildlife
Columbia Basin Fish Accords
Information for Contractors
Land Acquisitions
Resident Fish
Salmon and Steelhead
Spill Operation Agreement
Wildlife
Environmental Analysis
Currently selected
Types of NEPA Documents
Project Reviews
Categorical Exclusions
Endangered Species Act Process
Laws & Requirements
Cultural Resources
Transmission
Fish and Wildlife
FCRPS Cultural Resource Program
Pollution Prevention
Types of NEPA Documents
Project Reviews
Categorical Exclusions
2021
Currently selected
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
Endangered Species Act Process
Laws & Requirements
Categorical Exclusions 2021
A Categorical Exclusion (CX) is a determination that a specific proposed action is consistent with a previously identified category of actions that normally do not have significant environmental impacts and therefore normally do not require preparation of an Environmental Impact Statement (EIS). Individual proposed actions must satisfy several conditions to qualify. At Bonneville Power Administration (BPA), the National Environmental Policy Act (NEPA) Compliance Officer approves application of CXs. The normal CX review process is 3 months depending on interagency consultation requirements.
December
Growth Modulation in Salmon Supplementation
(12/30/2021)
Cowlitz PUD 230 kV Hycom Transmission Line Rebuild
(12/20/2021)
HVAC Installation at Covington Substation and Maintenance Headquarters (update to CX issued on May 21, 2021)
(12/17/2021)
YTAHP Caribou Creek at Gibb Fish Passage Project
(12/16/2021)
Gigapop Lane-Wendson Fiber Optic Connection
(12/16/2021)
Pride Disposal Driveway Entrance
(12/16/2021)
City of Salem Minto Brown Park Vegetation Management (update to previous Categorical Exclusion issued on October 6, 2020)
(12/15/2021)
Estimate Adult Steelhead Abundance in Small Streams Associated with Tucannon & Asotin Populations
(12/15/2021)
LSNA Floodplain Forest Expansion
(12/15/2021)
McKay Creek Watershed Steelhead Restoration Monitoring (update to CX issued April 29, 2021)
(12/15/2021)
PIT Tagging Wild Chinook
(12/14/2021)
North Bonneville Substation Revenue Meter Relocation and Backup Station Service Upgrades
(12/13/2021)
TRIP 3 Lot 12 Property Disposal
(12/10/2021)
South Coyote Creek III Property Acquisition and Stewardship Funding
(12/09/2021)
Jones Canyon-Santiam No.1 Heli-Feller Danger Tree Project – Areas H1, H2, H3, and H4
(12/09/2021)
Dupee Valley Reserve Property Acquisition and Stewardship Funding
(12/07/2021)
Addy-Cusick No. 1 Corridor Heli-saw Tree Pruning Project
(12/06/2021)
North Bend Radio Station VHF Radio System Upgrades
(12/03/2021)
Jeff Davis Creek Beaver Dam Analogs
(12/03/2021)
Seven-H Reserve Property Acquisition and Stewardship Funding
(12/01/2021)
Clark County Verizon Upgrades
(12/01/2021)
November
Aberdeen Substation Waterline Replacement Project
(11/30/2021)
Madison Substation Disconnect Switch Installation Project
(11/29/2021)
T-Mobile Wireless Upgrades at Tiger Mountain
(11/30/2021)
Pine Creek Conservation Area 2021 O&M
(11/23/2021)
YTAHP Parke Creek 1.0 and 1.4 Fish Passage and Screening Project
(11/22/2021)
YTAHP Wenas Creek at McKinney Riparian Enhancement Project
(11/18/2021)
T-Mobile Wireless Antenna Upgrades – Multiple Locations
(11/18/2021)
Montana Projects - Hungry Horse Radio Station Removal and Fiber Installation Project
(11/17/2021)
AT&T Bellingham LTE Upgrade
(11/17/2021)
Longview Substation Shunt Capacitor Group Relocation
(11/17/2021)
T-Mobile Maple Valley Generator Replacement
(11/17/2021)
T-Mobile Wireless Upgrades at Covington and Lake Sawyer
(11/15/2021)
Installation of Transmission Facilities at BPA’s Quenett Creek Substation
(11/15/2021)
Wendson Substation Bus Tie Addition and Control House Replacement Project
(11/15/2021)
Willamette Water Supply LURRS
(11/08/2021)
Basinwide Supplementation Evaluation
(11/08/2021)
Substation Equipment Upgrades and Expansion- Pasco Bundle (Update to previous CX issued March 25, 2020)
(11/05/2021)
Fence Maintenance and LWD Inspections
(11/05/2021)
Activities to Operate and Maintain High Voltage Electrical Facilities through 2024
(11/03/2021)
New Marking & Monitoring Technologies Project (update to CX issued on July 20, 2021)
(11/02/2021)
T-Mobile Wireless Upgrades at Tiffany Park
(11/02/2021)
Sacheen Alternate Station Service – Transformer Move Project
(11/01/2021)
Snohomish Substation Vehicle Storage Building Pole Replacement
(11/01/2021)
October
Log Springs Meadow Restoration
(10/28/2021)
Urgent Spring Creek–Wine Country No. 1 Structure 18/2 and 18/3 Tower Repair
(10/26/2021)
Road Creek Fencing and Planting Project
(10/26/2021)
T-Mobile Wireless Site Upgrades at Union Hill and Raging River
(10/26/2021)
Tepee Creek Low Tech Process-Based Restoration Project
(10/25/2021)
Verizon Upgrades at Multiple Washington Locations
(10/20/2021)
Naselle-Tarlett Distressed Structure 13/6 – 14/1 Project
(10/15/2021)
Ashe – Marion No. 2 Urgent Fitting Replacements
(10/15/2021)
Reservation Fence and Water Development Maintenance
(10/14/2021)
Skamania PUD North Bonneville Substation Expansion
(10/14/2021)
Continued funding to CRITFC for the monitoring of Snake River spring Chinook in the Grande Ronde Subbasin
(10/12/2021)
T-Mobile Wireless Upgrades at Multiple Washington Locations
(10/12/2021)
Ashe-Marion No. 2 / Ashe-Slatt No. 1 Span 54/5 Overhead Ground Wire Repair Project
(10/07/2021)
YTAHP Coleman Creek 4.3 at Beard/Leuck Habitat Improvement Project
(10/06/2021)
T-Mobile Wireless Upgrades at Lookout Mountain Radio Station
(10/06/2021)
Urgent Chief Joseph–Sickler No. 1 Structure 18/5 Tower Repair
(10/05/2021)
City of Ellensburg Water and Gas Pipeline Installations on East Ellensburg Tap to Columbia-Ellensburg No. 1
(10/05/2021)
September
Franklin-Schultz Fiber Optic Replacement Project
(09/29/2021)
Keeler-Oregon City No. 2 Transmission Line Right-of-Way Fiber Line Installation
(09/28/2021)
Metering and SCADA updates for Wheatridge Solar and Battery Integration
(09/27/2021)
Grand Coulee Switchyard Asset Transfer Project
(09/27/2021)
Joining the Western Energy Imbalance Market (EIM)
(09/27/2021)
Big Eddy - Redmond No. 1 Access Road Maintenance and Urgent Ross – Malin Fiber Line Repair
(09/23/2021)
Spring Creek – Wine Country Insulator Replacement Project
(09/23/2021)
Animal Grazing on North Bonneville-Midway No. 1 and Knight-Ostrander No. 1 Rights-of-Way
(09/23/2021)
Verizon Wireless Upgrades at Kitts Corner and Lea Hill
(09/23/2021)
White Creek Fish Passage Improvement Project
(09/23/2021)
Eugene Region VHF Radio System Upgrades – Goodwin Peak
(09/22/2021)
2021 Memorandum of Agreement between the Confederated Salish and Kootenai Tribes and the Bonneville Power Administration
(09/20/2021)
CTUIR Columbia River Basin Bio-Monitoring
(09/20/2021)
Portland General Electric’s Guy Wire Replacement Project on BPA’s Keeler-Allston No. 1 Transmission Line (LURR20210140)
(09/20/2021)
Middle Fly Creek Restoration Helicopter Project
(09/16/2021)
Last Chance Ranch Stock Water Project
(09/15/2021)
Idaho Salmon and Steelhead Monitoring and Evaluation Studies
(09/14/2021)
Technical Services Building Construction at the Ross Complex (update to CX issued on August 24, 2021)
(09/13/2021)
Cascade Forest Conservancy Beaver Reintroduction in Wind River Tributaries
(09/13/2021)
Freshwater Mussels Research Program (Update to previously issued Categorical Exclusion on May 1, 2018)
(09/10/2021)
Mill Creek Fishway Fish Passage Improvements
(09/10/2021)
Benton-Scooteney No. 1 Transmission Line Rebuild
(09/09/2021)
Willamette Valley 2021 Projects – Sorenson Fence Construction
(09/07/2021)
Chahalpam Floodplain Vegetation Management
(09/07/2021)
Tex Creek East and West Property Acquisition and Stewardship Funding (Update to previous Categorical Exclusion issued on July 15, 2021)
(09/07/2021)
Lemhi Reference Reach Project, Phase 1
(09/07/2021)
Tacoma-Covington No. 3 and 4 Wireless Antenna and Fiber Upgrades
(09/03/2021)
MREDI – Del Rio and Tunk VHF Radio Upgrades (update to previous categorical exclusion issued August 26, 2021)
(09/02/2021)
August
Latham Tap to Alvey-Martin Creek No. 1 Clearance Violation Correction
(08/31/2021)
Olympia-Grand Coulee No. 1 Phase IV Insulator Replacement
(08/30/2021)
Kalispell and Spokane Radio Regions 2021 Group VHF System Upgrades
(08/27/2021)
Partial Sale of Chemawa-Salem Alumina No. 1 Transmission Line
(08/27/2021)
Willamette Valley 2021 Projects – GAWA LWD (update to previous Categorical Exclusion issued August 2, 2021)
(08/27/2021)
MREDI – Del Rio and Tunk VHF Radio Upgrades
(08/26/2021)
Pacific Lamprey Research, Monitoring, and Evaluation
(08/26/2021)
Stabler Bend Invasive Vegetation Removal and Water Data Collection
(08/24/2021)
Enchanted Oaks Property Acquisition and Stewardship Funding
(08/24/2021)
MREDI – Malaga and Merritt
(08/24/2021)
Technical Services Building Construction at the Ross Complex
(08/24/2021)
Lower Columbia Estuary Partnership Monitoring Program (Update to previous categorical exclusion issued on October 2, 2020)
(08/23/2021)
Buck Meadows Fence Reconstruction Project
(08/23/2021)
Grays River – Oneida Floodplain Property Acquisition and Stewardship Funding
(08/19/2021)
T-Mobile Antenna Upgrade at Hazel Dell – Ross
(08/18/2021)
T-Mobile Carson Refarm Antenna Upgrade
(08/18/2021)
Boyer-Tillamook No. 1 Structure 4/2 Replacement
(08/18/2021)
Columbia Stock Ranch Livestock Watering Sources Project
(08/18/2021)
Shelton Control House Window Repairs and Landscaping Changes
(08/18/2021)
Sno-King Substation Security Upgrades
(08/17/2021)
AT&T Wireless Antenna Upgrades Multiple Locations
(08/17/2021)
Deschutes River Fall Chinook Research and Monitoring
(08/16/2021)
T-Mobile Upgrades at Maloney Ridge Radio Station
(08/16/2021
2021 Wireless Program Site Upgrades
(08/16/021)
Escapement and Productivity of Spring Chinook and Steelhead
(08/12/2021)
King County Weyerhaeuser Road Improvements
(08/11/2021)
Echo Lake-Monroe Access Road Improvements
(08/09/2021)
Munro Control Center (MCC) RF Back Flow Preventer and Meter Installation
(08/09/2021)
Categorical Exclusion (CX) Determination – Chief Joseph–Snohomish No. 3 & No. 4 & Chief Joseph-Monroe No. 1 Landing Zones/Access Road Work, Chelan County, WA
(08/06/2021)
YTAHP Coleman Creek 2.5 Valley Land Company Fish Passage Project
(08/06/2021)
Red River & Newsome Creek Watershed Restoration
(08/05/2021)
Snake River Fall Chinook Research & Monitoring Project
(08/05/2021)
PIT Tag Array Installations at Dead Canyon Creek and Trout Creek
(08/04/2021)
Yankee Fork Bonanza Weir Temporary Trapping
(08/04/2021)
Yakima/Klickitat Fisheries Project Swauk Creek Phase III Floodplain Restoration Project
(08/03/2021)
Snake River Chinook and Steelhead PBT Project
(08/03/2021)
Walla Walla Basin Vegetation Maintenance and Watershed Surveillance
(08/03/2021)
YTAHP Ranch on Swauk Creek Fish Passage and Screening Project
(08/02/2021)
Willamette Valley 2021 Projects – GAWA LWD
(08/02/2021)
July
Pacific Lamprey Comparative Performance Study and Gas Bubble Trauma Study
(07/30/2021)
Proposed Modified Open Access Transmission Tariff
(TC-22)
(07/28/2021)
FY 2022-2023 Proposed Power, Transmission, and Ancillary and Control Area Service Rate Adjustments (BP-22)
(07/28/2021)
Maupin Substation Generation Interconnection
(07/26/2021)
Mason and Jefferson PUDs Fiber Projects
(07/26/2021)
Dworshak-Taft No. 1 Line Mile 72 to 78 Static Wire Replacement
(07/26/2021)
Mount Spokane Radio Tower Acquisition
(07/26/2021)
Carlton Area Transmission Upgrades
(07/21/2021)
Middle Upper Grande Ronde Boulder Addition Project
(07/21/2021)
New Marking & Monitoring Technologies Project
(07/20/2021)
Neal Creek Phase I Aquatic Restoration
(07/15/2021)
Trout and Opal Creek Confluence Restoration
(07/15/2021)
Deep Creek Property Acquisition and Stewardship Funding
(07/15/2021)
Tex Creek East and West Property Acquisition and Stewardship Funding
(07/15/2021)
Oak Haven Conservation Easement Acquisition and Stewardship Funding
(07/14/2021)
Willamette Valley Wildlife Management Area Operations and Maintenance (2021 Update)
(07/13/2021)
Couse Creek PALS Project (update to previous Categorical Exclusion issued on July 17, 2020)
(07/13/2021)
Tenmile Creek RM 1.1 and 3.2 PALS Project (update to previous Categorical Exclusion issued on August 13, 2020)
(07/13/2021)
Study Reproductive Success of Hatchery and Natural Origin Steelhead in the Methow
(07/12/2021)
Tribal Pacific Lamprey Restoration Plan (Update to previous CX issued on July 8, 2020)
(07/09/2021)
N. Bonneville-Midway No. 1 Emergency Insulator Replacements; Towers 34/6, 80/2, 82/1 and 87/1
(07/09/2021)
MREDI – Merritt Antenna and Radio Equipment Installation
(07/09/2021)
North Bend Radio Station Antenna and Radio Equipment Installation
(07/08/2021)
Broadview-Garrison No. 2 Spacer Damper Replacement Project
(07/08/2021)
Alvey Substation 115kV Line and Substation Equipment Upgrades
(07/08/2021)
Qualco Energy Small Generator Integration
(07/08/2021)
West Fork Redhill Phase 3 Wood Placement
(07/08/2021)
Lake Roosevelt Data Collection
(0707/2021)
Rocky Reach – Maple Valley Transmission Line Access Road Improvement Project
(07/01/2021)
Pacific Marine Energy Metering and Telemetry
(07/01/2021)
Yakima/Klickitat Fisheries Project 2021 North Fork Teanaway Floodplain Restoration Project
(07/01/2021)
Fox Creek Passage Improvement
(07/01/2021)
June
Tinker Creek Improvement Projects
(06/28/2021)
Lemhi River Fish Screen Construction/Replacement
(06/28/2021)
Twisp Ponds Inlet Constructed Riffle Project
(06/24/2021)
Hidaway Creek Restoration
(06/24/2021)
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity, and Spatial Structure Monitoring
(06/24/2021)
Zayo Fiber Decommissioning Keeler to Alvey
(06/24/2021)
Avista Retermination to Bell Substation
(06/23/2021)
Vantage Substation Shunt Installation and Impairment Remediation
(06/23/2021)
Environmental Sampling and Remediation within the Ross-Vancouver Shipyard Transmission Line Corridor - LURR19941053 Amendment #7
(06/23/2021)
MREDI – Teanaway and Schultz VHF Radio Upgrades
(06/18/2021)
Grand Coulee – Okanogan No.2 Cold Springs Fire Access Road Remediation
(06/17/2021)
Chinook Valley Road Property Removal
(06/16/2021)
Sugar Mill Substation Equipment Sale
(06/14/2021)
Bonneville Powerhouse – North Bonneville Substation Transfer Trip Replacement
(06/14/2021)
North Bonneville Substation Grid Modernization Project
(06/11/2021)
Devine Road Bike and Pedestrian Pathway Project
(06/10/2021)
Status Creek Passive Integrated Transponder (PIT) Array Installation (update to previous Categorical Exclusion issued on February 1, 2021)
(06/10/2021)
Swan Valley - Teton No. 1 and No. 2 Access Road Maintenance and Urgent Cross-arm Replacement
(06/10/2021)
Ashe Substation Communication Fiber Replacement
(06/09/2021)
Conkelley Substation Decomissioning and Associated Work
(06/09/2021)
Hungry Horse Mitigation Habitat Restoration and Research, Monitoring, and Evaluation Project
(06/08/2021)
Operations and Maintenance at Albeni Falls Wildlife Areas Commencing in Summer 2021
(06/08/2021)
Isqúulktpe Watershed Area Operations and Management
(06/08/2021)
Lemhi Stream Restoration Informational Kiosk
(06/08/2021)
Upper Salmon Basin Operation and Maintenance of Tributary Habitat Improvement Projects
(06/08/2021)
FY21 Pasco District Priority Pole Replacements
(06/08/2021)
Knight-Ostrander No. 1 USFS 777 Road (Tanner Creek Road) Ford Maintenance Project
(06/07/2021)
Vancouver Sewer Line Replacement by Clark Regional Wastewater District
(06/07/2021)
Jones Canyon-Santiam No. 1 230- kV Corridor Heli-feller Danger Tree Removal
(0607/2021)
North Fork Touchet (Empey) Floodplain and Fish Habitat Restoration
(06/04/2021)
Removal of Weather Monitoring Equipment at BPA’s Mount Hebo Communications Site
(06/03/2021)
Nason Confluence Habitat Enhancement Project
(06/03/2021)
Chewuch River Mile 4.6 Habitat Enhancement Project
(06/01/2021)
May
Lostine Granger Road Repair Project
(05/28/2021)
Upper Grande Ronde Headwaters Hand Crew and Small Streams Restoration Project
(05/27/2021)
Willow Creek Fish Passage Restoration
(05/27/2021)
Ocean Survival of Salmonids Research Project
(05/27/2021)
East Fork Grande Ronde Upper Fly Creek Small Stream Project
(05/26/2021)
Operations and Maintenance at Shillapoo Wildlife Area
(05/24/2021)
FY21 Tacoma Substation Sewer Upgrade Project
(05/24/2021)
HVAC Installation at Covington Substation and Maintenance Headquarters
(05/21/2021)
Viable Salmonid Population (VSP) Estimates for the Yakima River Steelhead Major Population Group (MPG) Project
(05/19/2021)
Libby Reservoir Mitigation Restoration and Research, Monitoring, and Evaluation Project
(05/19/2021)
Hungry Horse Mitigation – Creston Hatchery
(05/19/2021)
PLCI Lamprey Passage Barrier Inventory
(05/19/2021)
Albeni Falls Dam RM&E
(05/18/2021)
Routine Maintenance of Bonneville Power Administration Access Roads
(05/14/2021)
Bell-Usk No. 1 urgent access road repair and insulator replacement
(05/14/2021)
Salem-Chemawa No. 1 and No. 2 Encroachment Removal
(05/14/2021)
Toledo Substation Breaker Addition Project
(05/11/2021)
Columbia Basin PIT Tag Support Project
(05/10/2021)
Resident Fish Monitoring and Assessment above Chief Joseph and Grand Coulee Dams
(05/10/2021)
Asotin County Projects (2020-24, 2020-26)
(05/06/2021)
North Touchet Conservation Easement Acquisition
(05/06/2021)
FY-19 Redmond-Brasada, Redmond-Pilot Butte, Big Eddy-Redmond, LaPine-Chiloquin, Pilot Butte-LaPine, Canby Tap, and Brasada-Harney Transmission Line Wood Pole Replacement
(05/03/2021)
T-Mobile LTE Antenna Upgrade at West Portland Radio Station
(05/03/2021)
AT&T Winona LTE Antenna Upgrade
(05/03/2021)
April
Bell-Boundary Span Rebuild
(04/30/2021)
Shultz-Raver No. 3 Structures 49/4 and 59/4 Access Road Improvement Project
(04/30/2021)
McKay Creek Watershed Steelhead Restoration Monitoring
(04/29/2021)
Marshland Road Property Acquisition
(04/29/2021)
Spokane Wildlife Areas Operations & Maintenance
(04/29/2021)
Golden Doe Large Wood Project
(04/28/2021)
Wapato Lake Unit Vegetation Management
(04/28/2021)
PNNL SET Installation
(04/27/2021)
United States Forest Service Use of Bonneville Power Administration’s Transportation System Road
(04/27/2021)
Chemawa – Salem No. 1 & 2 Span 10/4 Fence and Gate Installation Project
(04/26/2021)
Sammamish-Maple Valley Reconductoring
(04/26/2021)
HVAC Replacement at Shelton Substation
(04/26/2021)
Scotch Creek Wildlife Area Operations and Maintenance
(04/23/2021)
Asotin County Conservation District - Water Developments and Farmland Conversion (2019-12, 2019-21, 2019-23) (updated)
(04/23/2021)
Asotin County Spring Developments (2017-02, 2020-22) (updated)
(04/23/2021)
Radar Hill Substation Interconnection
(04/23/2021)
Big Eddy - Troutdale No. 1 Access Road Maintenance and Urgent Fiber Line Repair
(04/22/2021)
Wanaket Wildlife Area Operation and Maintenance
(04/22/2021)
Funding for USFS Pacific Northwest Research Station’s Willamette fish sampling Research, Monitoring, and Evaluation (RM&E). (Update to previous categorical exclusion issued on June 25, 2020)
(04/21/2021)
Tacoma Substation Security Upgrades
(04/21/2021)
Operations, Maintenance, and Aquatic Habitat Research in the Pend Oreille Subbasin
(04/21/2021)
Pacificorp Underground 12.5 kV Line Installation at Roundup Substation Property
(04/15/2021)
Bell-Addy No. 1 Structure 15/2 Urgent wood pole replacement
(04/15/2021)
FY21 Tacoma-Raver Access Road Improvement Project
(04/14/2021)
BPA/Centralia City Light Asset Transfer
(04/14/2021)
Stream Gauge Installation and Operation on Ross-Lexington No. 1
(04/13/2021)
Wine Country-Midway No. 1 Transmission Line Insulator Replacement Project
(04/13/2021)
Cultural Resources Management of Kalispel Tribe Fish and Wildlife Projects
(04/13/2021)
Trout Creek Watershed Restoration and Operations and Maintenance
(O&M) (04/13/2021)
Continued Funding to Pacific States Marine Fisheries Commission and United States Fish and Wildlife Service for Ongoing Comparative Survival Study
(04/13/2021)
Day Mt. Spokane Tap Switch Replacement Project
(04/12/2021)
Slatt Station Service Upgrade Project
(04/09/2021)
Lake Pend Oreille/Dworshak Reservoir Fish Migration Research
(04/06/2021)
Lamprey Holding Infrastructure Modifications and Upgrades at Minthorn Springs
(04/05/2021)
Big Eddy Direct Current Test Line Removal Project
(04/02/2021)
South Fork Snake River Yellowstone Cutthroat Trout Recruitment and Survival Improvement
(04/02/2021)
March
Urgent: Martin Creek – Drain 9/4 Wood Pole Replacement
(03/31/2021)
Dworshak Powerhouse – Dworshak Structure 2/3 Urgent Culvert Replacement
(03/31/2021)
Sagebrush Flat Wildlife Mitigation Area Road Repair
(03/31/2021)
ShoPai Solar Water Trough, Culvert, and Fence Maintenance
(03/29/2021)
Habitat Project Action Effectiveness Monitoring
(03/29/2021)
Takilth Property Acquisition and Stewardship Funding
(03/29/2021)
Shoshone-Bannock Wildlife Areas - Legacy Springs, Bannock Creek, and Lavaside properties- Annual Operation and Maintenance
(03/29/2021)
Nez Perce Harvest Monitoring Project (updated)
(03/17/2021)
Oregon Fish Screen Projects, Gravity Screens (JDR #24, #26, Indian Creek–Holiday, Indian Creek-Winegar, and Flat Creek #2)
(03/15/2021)
PLCI Citizen Science Lamprey Monitoring
(03/15/2021)
FY-19 Redmond-Brasada, Redmond-Pilot Butte, Big Eddy-Redmond, LaPine-Chiloquin, Pilot Butte-LaPine, Canby Tap, and Brasada-Harney Transmission Line Wood Pole Replacement
(03/12/2021)
Nez Perce Trout Ponds
(03/11/2021)
BPT Jonesboro Waterline Installation (updated)
(03/10/2021)
Lemhi Hydroseeding and Invasive Weed Treatment
(03/09/2021)
FY19 North Bend Transmission Line Maintenance (TLM) District Priority Poles and Access Road Maintenance Project
(03/08/2021)
Columbia River Estuary Study Taskforce Action Effectiveness Monitoring
(03/08/2021)
Columbia Basin Water Transactions Program (updated)
(03/08/2021)
Salem – Albany No. 2 Structure 3/4 Urgent Replacement Project
(03/05/2021)
Central Lincoln PUD Reconductoring at Gardiner Substation
(03/05/2021)
Nonnative Fish Suppression in the Pend Oreille Subbasin
(03/04/2021)
Golden Hills Wind Farm Interconnection (update to previous CX issued on February 4, 2021)
(03/04/2021)
Dead Cow Wood Placement (updated)
(03/04/2021)
Hilltop-Warner No. 1 Miles 3-7 Access Road Improvement Project
(03/03/2021)
February
Smolt Monitoring by Non-Federal Entities
(02/25/2021)
BPT Logan Valley Wildlife Mitigation (updated)
(02/24/2021)
Transmission Line Marker Ball Replacement Phase II Project
(02/23/2021)
PBS Site Investigations on North Bonneville-Ross Right-of-Way (update to previous CX issued on October 16, 2019)
(02/22/2021)
Celilo Converter Station and Transmission Line Retirement
(02/19/2021)
Sheepshead Property Acquisition
(02/17/2021)
T-Mobile Communications Equipment Upgrade at Potholes Substation
(02/17/2021)
Valley Creek PIT Tag Array Consolidation
(02/12/2021)
Tacoma Substation Breaker Replacement and Additions
(02/10/2021)
South of Garrison Facilities Sale to NorthWestern Energy
(02/09/2021)