PROJECT DESCRIPTION:
The Bonneville Power Administration (BPA) rebuilt its Alvey-Fairview 230-kilovolt Transmission Line between Eugene and Coquille, Oregon. To understand the potential environmental impacts of this proposal, BPA prepared an environmental assessment (EA). Two alternatives were studied in the EA: to rebuild the line or to not rebuild the line, and continue on with current operation and maintenance practices. The EA described anticipated impacts to natural and human resources and included mitigation measures that will help avoid or minimize impacts.
CURRENT STATUS:
BPA issued the final EA and Finding of No Significant Impact (FONSI) for the project in 2014 and decided to proceed with the Proposed Action. Project construction is began in June 2014 and was completed in December 2015.
PROJECT SCHEDULE: Scoping comment period: Scoping public meeting: Scoping public meeting: Draft EA comment period: Final EA: Finding of No Significant impact: Construction start: Construction completed:
CONTACT: For environmental information, contact: Doug Corkran Environmental Protection Specialist Bonneville Power Administration - ECT-4 P.O. Box 3621 Portland, OR 97208-3621
For project information, contact: James Semrau Project Manager Bonneville Power Administration P.O. Box 61409 Vancouver, WA 98666-1409 |
November 15, 2011 through December 28, 2011 November 30, 2011 in Sutherlin, Oregon December 7, 2011 in Cottage Grove, Oregon February 7, 2014 through March 3, 2014 April 21, 2014 April 21, 2014 Summer 2014/2015 December 2015
Toll-free: 800-622-4519 Direct line: 503-230-7646 Email: dfcorkran@bpa.gov
Toll-free: 800-622-4519 Direct line: 360-619-6629 Email: jesemrau@bpa.gov
|
DOCUMENTS:
PROJECT UPDATE:
Public Letter - Notice of Construction (03/31/2015)
FINAL EA:
Public Letter (05/02/2014)
FONSI and Mitigation Action Plan (04/21/2014)
Final EA (04/21/2014)
DRAFT EA:
Draft EA comments received
Public Letter (02/07/2014)
Draft EA (February 2014)
Comment Form (02/07/2014)
SCOPING:
Scoping comments received
Public Letter (11/15/2011)
Project Map (06/15/2011)
Comment Form (11/15/2011)
EA Determination Memo (08/05/2011)