​Keeler to Tillamook Transmission Line Rebuild (DOE/EA-1931)
Washington and Tillamook counties, Oregon

PROJECT DESCRIPTION:
Bonneville Power Administration (BPA) has made the decision to rebuild the Keeler to Tillamook 115-kilovolt (kV) transmission line. The 58 mile long wood-pole line extends from Hillsboro to Tillamook, Oregon. Based on the final environmental assessment (EA), BPA is issuing a finding of no significant impact (FONSI) and has made a decision to proceed with the project. The rebuild includes replacement of all wood-pole structures over 10 years in age, including cross arms, cross braces, guy wires, anchors, insulator assemblies, switches, and overhead conductor. The rebuild will enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line will continue to operate at 115-kV.

CONTACT:
For further environmental information on this project, please contact ECAdmin@bpa.gov or 503-230-4628.

For project information, contact:

Nathan Mullen
Project Manager

Bonneville Power Administration - TEP-TPP-1
P.O. Box 61409
Vancouver, WA 98666-1409
Toll-free:
Direct line:
Email:
800-622-4519
360-619-6302
ndmullen@bpa.gov

DOCUMENTS:
Meet the Contractor Letter              (03/21/2014)
Keeler to Tillamook Outage Map     (12/11/2013)

FINAL EA / FONSI:
Public Letter                                (02/21/2014)
Final EA                                      (02/06/2014)
FONSI and Mitigation Action Plan     (February 2014)

DRAFT EA:
Public Letter           (11/01/2013)
Draft EA                 (October 2013)
Project Map            (08/09/2012)
Comment Form      (11/01/2013)

SCOPING:
Public Letter           (08/20/2012)
Comment Form      (08/20/2012)
Project Map            (08/20/2012)

Determination Memo  (07/17/2012)