PROJECT DESCRIPTION:
Sea Breeze Olympic Converter LP (Sea Breeze), a private developer, is planning to construct a 550-megawatt direct current (DC) electric transmission cable from Victoria, British Columbia, Canada, across the Strait of Juan de Fuca to Port Angeles, Washington. Sea Breeze received a Presidential permit from the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) for the international crossing of the cable, and was granted authorization from BPA to connect into the federal electric transmission system.
The cable will be placed in a trench on the sea floor of the Strait for most of its length, with about 12 miles in U.S. jurisdiction. On land, it will be placed in a trench in local streets in Port Angeles and will connect to a proposed DC/AC converter station, which in turn will connect to the adjacent Bonneville Power Administration (BPA) Port Angeles Substation. This existing BPA substation will be expanded to accommodate the cable interconnection.
In March 2007, DOE (BPA and OE) released a draft environmental impact statement (EIS) that analyzed the potential impacts of the project. In October 2007, a Final EIS was released that addressed comments that were received on the draft. DOE decided to implement the Proposed Action and Preferred Alternative as described in the EIS and a Record of Decision was signed in Washington DC on May 27, 2008 and in Portland Oregon on May 30, 2008.
CURRENT STATUS:
DOE (BPA and OE) has decided to implement the Proposed Action and Preferred Alternative as described in the EIS. The Record of Decision was signed in Washington DC on May 27, 2008 and in Portland Oregon on May 30, 2008.
CONTACT:
Stacy Mason, BPA Environmental Lead |
Toll free: |
800-622-4519 |
Bonneville Power Administration - ECP-4 |
Direct line: |
503-230-5455 |
P.O. Box 3621 |
Email: |
slmason@bpa.gov |
Portland, Oregon 97208-3621 |
|
|
DOCUMENTS:
RECORD of DECISION:
Public Letter (06/02/2008)
Record of Decision (05/30/2008)
Mitigation Action Plan (05/30/2008)
Supplement Analysis (02/05/2008)
FINAL EIS:
Public Letter (10/04/2007)
Final EIS (October 2007)
DRAFT EIS:
Public Letter (03/08/2007)
Comment Form (03/08/2007)
Draft EIS (03/02/2007)
Figures not embedded in draft EIS:
Figure S-1 Project Location
Figure 1-1 Project Location
Figure 2-1 Marine Corridor for Proposed Action
Figure 2-4 Proposed Cable Route into Port Angeles Harbor
Figure 2-7 Proposed Cable Route into Port Angeles
Figure 2-9 Layout of Proposed HDD Construction Site
Figure 2-11 Converter Station Site & BPA Substation
Figure 3-1 Strait of Juan de Fuca
Figure 3-2 Converter Station and Substation Vicinity
Figure 3-3 Habitat and Species
Figure 3-4 Soils in Project Vicinity
Figure 3-5 Seismic Site Classes
Figure 3-6 Identified Faults in Project Vicinity
Figure 3-7 Aerial Photo of Project Vicinity
Figure 3-12 Foreseeable Future Actions
Appendix A - Sea Breeze HVDC Light - Technical Background
Appendix B - Scoping and Consultation
Appendix C - Bathymetric and Surficial Geology
Appendix D - Special Status Plant Species in Clallam County
Appendix E - Contractor Disclosure Forms
Updated Schedule Public Letter (05/10/2006)
SCOPING:
Public Letter (05/04/2005)
Fact Sheet (05/24/2005)
Map (05/24/2005)
Notice of Intent (04/28/2005)
Public Meeting Materials (05/24/2005)