PROJECT DESCRIPTION:
300 megawatt Wind Project.
CURRENT STATUS:
Work on the EIS was halted. PacificCorp has contracted with FPL Energy (the project developer) to buy all of the output from the project. A Categorical Exclusion (CX) was prepared for the interconnection of 90 MW of power into a BPA transmission line [see DOCUMENTS below].
CONTACT:
For further information on this project, please contact ECAdmin@bpa.gov or 503-230-4628.
DOCUMENTS:
Categorical Exclusion (11/07/2001)
Notice of Intent (06/12/2000)
Scoping Letter (06/07/2000)
Public Letter (06/07/2000)