PROJECT DESCRIPTION:
Build 5.1 miles of new 500-kV transmission line from a proposed natural gas-fired power generation plant in Wallula, WA to a new substation at Smiths Harbor, where the line will connect with the existing Lower Monumental-McNary transmission line.
CONTACT:
For further information on this project, please contact ECAdmin@bpa.gov or 503-230-4628.
DOCUMENTS:
RECORD of DECISION:
Public Letter (03/14/2003)
ROD (03/10/2003)
DRAFT EIS:
Public Letter (05/28/2002)
DEIS Fact Sheet (March 2002)
New Tower Design (March 2002)
Phase II Air Study (12/10/2001)
SCOPING:
Scoping Report (11/05/2001)
Public Letter (05/22/2001)
Public Letter (04/05/2001)
NOTICE of INTENT:
Notice of Intent (03/26/2001)